hydroelectric power

Powering Ontario’s Growth

Powering Ontario’s Growth

In April 2022, the Minister of Energy announced that Ontario is advancing work to develop the Niagara Hydrogen Centre, led by Atura Power. This project would increase the amount of low-carbon hydrogen produced in Ontario by eight times by using excess water at Niagara Falls that would otherwise be sent over the falls to generate clean electricity for low-carbon hydrogen production. This low-carbon hydrogen could then be sold to fuel transportation or industry or injected into a natural gas generating station to lower its carbon intensity.

Back to top Treaty talks for assured flood control have impacts in Nelson and area: province

Back to top Treaty talks for assured flood control have impacts in Nelson and area: province

Time may be expiring on the Columbia River Treaty but a stream of issues to continue workability between Canada and the U.S. won’t be water under the bridge just yet. Sixty years of Assured Flood Control is set to expire in 2024 but the two countries have been in talks to modernize the historical transboundary agreement since May 2018, covering a range of topics over the course of 10 rounds of meetings.

Dickson Dam plays critical role during flood season

Dickson Dam plays critical role during flood season

Dickson Dam, located approximately 180 kilometres northwest of Drumheller on the Red Deer River, plays a key role in the ongoing flood mitigation efforts in the Drumheller Valley through flow regulation and communication with municipal operators. Director of North Central Region of Alberta Environment and Parks, Water Infrastructure, and Operations Branch Rick Friedl was one of the operators involved at Dickson Dam during the 2005 flood event and took time to speak with the Mail to explain the purpose of the dam and its role in the 2005 and 2013 flood events.